ACER | Agency for the Cooperation of Energy Regulators |
Bcm / Bcma | Billion cubic meters / Billion cubic meters per annum |
CBA | Cost-Benefit Analysis |
CSA | Commercial Supply Access indicator |
EC | European Commission |
ENTSO-E | European Network of Transmission System Operators for Electricity |
ENTSOG | European Network of Transmission System Operators for Gas |
EU | European Union |
FID | Final Investment Decision |
GIE | Gas Infrastructure Europe |
GHG | Greenhouse Gases |
GRIP | Gas Regional Investment Plan |
GWh | Gigawatt hour |
LNG | Liquefied Natural Gas |
Low infrastructure | Existing infrastructure + FID projects |
MASD | Minimum Annual Supply Dependence indicator |
MWh | Megawatt hour |
NDP | National Development Plan |
PCI | Project of Common Interest |
RES | Renewable Energy Sources |
SoS | Security of Supply |
TSO | Transmission System Operator |
TWh | Terawatt hour |
TYNDP | Ten-Year Network Development Plan |
UGS | Underground Gas Storage (facility) |
Country Codes (ISO)
AL | Albania |
AT | Austria |
AZ | Azerbaijan |
BA | Bosnia and Herzegovina |
BE | Belgium |
BG | Bulgaria |
BY | Belarus |
CH | Switzerland |
CY | Cyprus |
CZ | Czech Republic |
DE | Germany |
DK | Denmark |
DZ | Algeria |
EE | Estonia |
ES | Spain |
FI | Finland |
FR | France |
GR | Greece |
HR | Croatia |
HU | Hungary |
IE | Ireland |
IT | Italy |
LT | Lithuania |
LU | Luxembourg |
LV | Latvia |
LY | Libya |
MA | Morocco |
ME | Montenegro |
MK | FYROM |
MT | Malta |
NL | Netherlands, the |
NO | Norway |
PL | Poland |
PT | Portugal |
RO | Romania |
RS | Serbia |
RU | Russia |
SE | Sweden |
SI | Slovenia |
SK | Slovakia |
TM | Turkmenistan |
TN | Tunisia |
TR | Turkey |
UA | Ukraine |
UK | United Kingdom |
Legal Disclaimer
The TYNDP was prepared in a professional and workmanlike manner by ENTSOG on the basis of information collected and compiled by ENTSOG from its members and from stakeholders, and on the basis of the methodology developed with the support of the stakeholders via public consultation. The TYNDP contains ENTSOG own assumptions and analysis based upon this information.
All content is provided “as is” without any warranty of any kind as to the completeness, accuracy, fitness for any particular purpose or any use of results based on this information and ENTSOG hereby expressly disclaims all warranties and representations, whether express or implied, including without limitation, warranties or representations of merchantability or fitness for a particular purpose. In particular, the capacity figures of the projects included in TYNDP are based on preliminary assumptions and cannot in any way be interpreted as recognition, by the TSOs concerned, of capacity availability.
ENTSOG is not liable for any consequence resulting from the reliance and/or the use of any information hereby provided, including, but not limited to, the data related to the monetisation of infrastructure impact.
The reader in its capacity as professional individual or entity shall be responsible for seeking to verify the accurate and relevant information needed for its own assessment and decision and shall be responsible for use of the document or any part of it for any purpose other than that for which it is intended.
In particular, the information hereby provided with specific reference to the Projects of Common Interest (“PCIs”) is not intended to evaluate individual impact of the PCIs and PCI candidate. For the relevant assessments in terms of value of each PCI the readers should refer to the information channels or qualified sources provided by law.
Publishing Info
Publisher
ENTSOG AISBL
Avenue de Cortenbergh 100
1000 Brussels, Belgium
Co-Authors
Stefano Astorri, Magdalena Bogucka, Anne Boorsma, Maria Castro, Paula Di Mattia, Maria Fernandez, Martin Gravesgaard Nielsen, Rares Mitrache, Jacques Reberol, Cihan Sönmez, Louis Watine, Arnaud Weissrock, Kacper Zeromski, Nemo KG, INV WG, SCN WG, WGSB
Cover picture
Courtesy of FGSZ
Design
DreiDreizehn GmbH, Berlin | www.313.de